Strolling through September
A surprisingly cool September. Building-wise a tad sluggish, slowly but surely, step by step. Having said that the photos taken over the month do seem to show some progress. All the internal walls have been covered. They are now lined with a double layer of silver thermal insulating material (a kind of posh bubble wrap) and bricked over, both downstairs and up. The only wall to remain uncovered is an original external wall which separates two rooms, one which is…